logo
products

Automatic compensation 3000KG per batch all mix asphalt plant with all dust smoke gas purification

Basic Information
Certification: CE/CNAS/SGS/ISO
Model Number: QLB-HX
Minimum Order Quantity: 1 set
Price: negotiation
Packaging Details: Nude packing on bulk ship
Delivery Time: 2 month after received down payment
Supply Ability: 12 sets per month
Detail Information
Model NO.: QLB-HX3000 Production Capacity: 240t/h
Ready Product Bin: 200T Powder Silo: 70 Cubic Meter
Waste Filler Hoister: 30tph Pulse Dust Collector: Overflow Bin And Filler Bin(60 Cubic Meter)
Equipment Color: Light Sky Blue Rockwool: 80mm
Highlight:

asphalt hot mix plant

,

bitumen hot mix plant


Product Description

Auto compensation 3000KG per batch Hot mix asphalt plant with all dust smoke gas purification

 

1, About Xitong asphalt mixing plant history 

Basing on absorbing the advanced foreign technique, we developed this new-generation facility, which contains mechanical, electrical, and pneumatic technique. It is a special whole set facility, which can produce any hot-mixing asphalt concrete to meet road-engineering requirement. The facility including many advantages, such as reasonable configuration, high-level automation, precise measurement, easy operation, low energy cost, less pollution, stabile mixing quality, and better security.

 

2. Safety and notice 

A. Ensuring the following items before any maintenance or repair of hot mixing batch plan.

⑴. Shut off the main power supply, and make sure the machine is keeping stop.

⑵. Send out operating alarm, and show the alarm signal at essential position.

⑶. When carrying on adjust to try at any rotary place, there must have the specially assigned person to pay attention to control of the urgent stop button.

⑷. When examining and repairing the inner of facility, be sure to shut off any power supply and close electrical control house, and hang the sign of facility overhaul and prohibiting shutting switch.

⑸. Only qualified and capable electrician could operate electrical system after authorization.

⑹. Before restart the machine, send out alarm ring, and inform all the persons to be careful.

⑺. During operation, equip all the security protection all the time.

 

Automatic compensation 3000KG per batch all mix asphalt plant with all dust smoke gas purification

Automatic compensation 3000KG per batch all mix asphalt plant with all dust smoke gas purification

Maintenance of lubrication for batch type asphalt hot mixing plant 

 

Lubrication schedule

Item Position Cycle Type Remark
1 Vibration mesh Principal axis bearings Everyday 1# lithium grease 2~3- shot
2 Hot aggregate silo Gate shaft bearings Every month 2# calcium base grease 1- shot
3 Mixer Principal axis bearings 3 days 1# lithium grease 2~3- shot
Gate shaft bearings Every month 2# calcium base grease 1- shot
Large gear Every month 2# calcium base grease  
4 Exhaust fan Principal axis bearings 3 days 1# lithium grease 2~3- shot
5 Screw conveyor End bearings 3 days 2# calcium base grease 1- shot
6 Asteroids feeder End bearings 3 days 2# calcium base grease 1- shot
7 Weighing silo Gate shaft bearings Every month 2# calcium base grease 1- shot
8

Finishe-d product

Silos

Trolley Trolley surfaces 7 days 2# calcium base grease Protecting inunctions
Bearing 3 days 2# calcium base grease 1-shot
Door roller 7 days 2# calcium base grease 1-shot
9

Wind

lass

Reel bearing 3 days 2# calcium base grease 1~2- shot
Wire rope 7 days 2# calcium base grease Protecting inunctions
10 Other Gate shaft 7 days 2# calcium base grease 1-shot
Rope wheel 7 days 2# calcium base grease 1~2- shot
11 All adjusting screw Every month 2# calcium base grease Protecting inunctions
 

Contact Details