Model NO.: | QLB-HX3000 | Production Capacity: | 240t/h |
---|---|---|---|
Ready Product Bin: | 200T | Powder Silo: | 70 Cubic Meter |
Area Occupation: | 2028 Square Meter | Fuel: | Light Oil, Heavy Oil |
Filler Bin: | Stand Barrel Type | Rockwool: | 80mm |
Highlight: | hot mix bitumen plant,asphalt hot mix plant |
70m3 filler bin and Sound-light alarm against overflow hot mix asphalt plant with WAM screw conveyor
Lubrication tips for hot mixng asphal batching plants
The detailed lubrication instruction of relevant electromotor and reducer consult to the provided maintenance manual, and air compressors are served in the same way.
1. Every 8 to 10 hours (one day)
Every 50 to 60 hours(one week)
Every 200 to 250 hours(one month)
2. All bearings should be greased only 30-50% of the free space within bearings in advance, and the excessive grease will cause bearings overheated easily instead.
3. The volume of each shot is about 16 milliliters.
Control system features
⑴. Achieve friendly interface and strong function of man-machine conversation.
⑵. Real-time indication of working state of each set.
⑶. Particular automatic rationing function of cold feeding system.
⑷. Accurate temperature-control mode of PID.
⑸. Particular automatic compensation function for metage.
⑹. Effective administration of material ratio and producing parameter.
⑺. Manage consumption of material.
⑻. Powerful function of fault monitoring and cuing.
⑼. Convenient automatic control for whole system.
⑽. Powerful function of producing-status rogatory and powerful function of primary producing-status recording and print.
⑾. Long-distance diagnosing function through Internet.
Maintenance of lubrication for batch type asphalt hot mixing plant
Lubrication schedule
Item | Position | Cycle | Type | Remark | ||
1 | Vibration mesh | Principal axis bearings | Everyday | 1# lithium grease | 2~3- shot | |
2 | Hot aggregate silo | Gate shaft bearings | Every month | 2# calcium base grease | 1- shot | |
3 | Mixer | Principal axis bearings | 3 days | 1# lithium grease | 2~3- shot | |
Gate shaft bearings | Every month | 2# calcium base grease | 1- shot | |||
Large gear | Every month | 2# calcium base grease | ||||
4 | Exhaust fan | Principal axis bearings | 3 days | 1# lithium grease | 2~3- shot | |
5 | Screw conveyor | End bearings | 3 days | 2# calcium base grease | 1- shot | |
6 | Asteroids feeder | End bearings | 3 days | 2# calcium base grease | 1- shot | |
7 | Weighing silo | Gate shaft bearings | Every month | 2# calcium base grease | 1- shot | |
8 |
Finishe-d product Silos |
Trolley | Trolley surfaces | 7 days | 2# calcium base grease | Protecting inunctions |
Bearing | 3 days | 2# calcium base grease | 1-shot | |||
Door roller | 7 days | 2# calcium base grease | 1-shot | |||
9 |
Wind lass |
Reel bearing | 3 days | 2# calcium base grease | 1~2- shot | |
Wire rope | 7 days | 2# calcium base grease | Protecting inunctions | |||
10 | Other | Gate shaft | 7 days | 2# calcium base grease | 1-shot | |
Rope wheel | 7 days | 2# calcium base grease | 1~2- shot | |||
11 | All adjusting screw | Every month | 2# calcium base grease | Protecting inunctions |