products

45kw Burner Fan Asphalt Dry Batching Plant , Bitumen Processing Plant 240 Ton Per Hour

Basic Information
Certification: CE/CNAS/SGS/ISO
Model Number: QLB-X
Minimum Order Quantity: 1 set
Price: negotiation
Packaging Details: Nude packing on bulk ship
Delivery Time: 2 month after received down payment
Supply Ability: 12 sets per month
Detail Information
Production: 240ton Per Hour Type: Finished Silo Bottom Put
Oil Consumption: 6.5kg/t Asphalt Tank: 50T
Lubrication: Progressive Type Weighing Method: Auto Tracking/auto Correction
Dryer Drum: 9000*2750mm Ratio Adjustment: 1:10
Highlight:

dry batching plant

,

ready mix batching plant


Product Description

45kw burner fan asphalt batching plant with heat resistance Nomex filter pocket

 

 

Daily maintenance for cold aggregate ground hopper of hot mixing batch type asphalt plant

The following items are the guide for daily maintenance and check-up.

⑴. Material should be discharged centrally on conveyor and the movement of belt receiving position should be even, straight and centered. If not, find out cause and put right.

⑵. Check the flitch under hopper discharging chute for material overflowing between flitch and belt.

⑶. Check the belt for movement even, straight, and center. If not, adjust the conveyor according to former recommended sequence.

⑷. Check conveyor belt termly, arrange early maintenance to prevent life-shortening and damage-expanding. Use benzene as cleanser and special type glue to conglutinate.

⑸. Check the movement of belt for skid phenomena to avoid premature friction damage.

⑹. Check supporting roller for turning, if there is any question, adjust or replace it to protect belt.

⑺. Check the sweeper for its function. Ensure all sweeper pivot can move freely and not be blocked. Check the scrape-board for its contact with belt, if it contacts belt uneven or brings damage to belt, replace it.

⑻. Lubricate all required bearings and active parts according to prescribed schedule. Clean up bearings termly and inject grease anew but not excessively, this is very important, because excessive grease will lead bearing overheated and wear out early.

⑼. Check reducer for oil level according to manufacturer recommended cycle, make up it with clean oil or give out remainder oil first.

⑽. Try to keep operation condition clean; this is the important to get long serving life and most efficient benefit. All overflowed and splashed material should be cleaned termly.

45kw Burner Fan Asphalt Dry Batching Plant , Bitumen Processing Plant 240 Ton Per Hour

 

45kw Burner Fan Asphalt Dry Batching Plant , Bitumen Processing Plant 240 Ton Per Hour

 

No. Item Quantity Remark
A Feeding System Of Cold Aggregate 
1 Cold stone Hopper (two with wall vibrator) 5pcs hopper-connected together, with empty hopper alarm device
2 Strap Feeder 5 sets variable speed by frequency control
3 Collective Belt Conveyer 1 set  
4 Slope belt conveyer 1 set  
B Drying drum and burner
1 Dryer(Friction Driven) 1set stainless steel insulation
2 Burner 1set Energy Italy EB9
3 50T Diesel tank 1set  
C Hot aggregate elevator
1 Stone Material Hoistor 1set  
D Hot Material Sieving mechanism
1 Vibration Screen 1set USA cold-driven rivet tech.
E Mixer
1 Mixing Tank(Double Hard Teeth-surface Speed-Reducer) 1set  
2 Asphalt Metering Spray Pump 1set  
F Main mixing tower frame System
1 Main Frame Equipped With Platform, Handrail And Guard Railing 1set  
2 Hot Material Bins (Five Bins, Continuous level indicator) 1set Color steel heat-preservation
3  Asphalt ready mixture bin(with Heat-insulation) 1set 120T
4 Feeding trolley 1set  
5 Overflow & Waste Material Bins 1set  
G Weighing System
1 Aggregate weighing 1 set American Toledo sensor, Japanese metering device
2 Fine material weighing 1 set
3 Asphalt weighing 1 set
H Mineral and waste material Storage Supply System
1 Mineral Powder Bin(50m3) 1 set With bursting equipment
2 Reclaimed Powder Bin(50m3) 1 set With bursting equipment
3 Waste filler elevator 1set  
4 Spiral Conveyer 6pcs  
5 Pneumatic butterfly valve 3sets WAM, Italy
I Dust Collector
1 First step Volute Casing Collector 1set  
2 Secondary Bag Collector (Air Back-flushing) 1set Nomex, bag made in USA
3 Induced draft Fan, Smoke Path and Chimney(Soft Start-up) 1set Electronic Air Door
J Pneumatic Control System
1 Pneumatic part 1set  
2 2m3 Compressor 1set  
3 0.6m3 air accumulator 1pcs  
K Electronic Control System
1 Electrical operation room (with two air condition) 1 set  
2 Computer control system 1 set PLC mitsubishi
L Asphalt Heating And Storage System
1 QXM-75 heat transfer oil furnace 1set  
2 Imported Burner 1set Germany(Weishuapt)
3 50T High-temperature Asphalt tank 3pcs  
4 2T asphalt reception Tank 1pc  
5 Asphalt Pump 2sets  
6 Heat transfer oil Control System (Full Automatic) 1 set  
7 Asphalt heat transfer oil Pipeline 1 set  

 

 

Contact Details