Product Model: | QLB-1000 | Diesel Tank: | 16T |
---|---|---|---|
Storage Silo Type: | By-side | Hot Aggregate Bin Capcity: | 36T |
Cold Feeder: | 4 Pieces | Certification: | ISO/SGS/CE |
Container No.: | 17 Units Of 40HQ/GP Container | Area Occupation: | 1075 Squrare Meter |
Warranty: | 12month | ||
Highlight: | drum mix asphalt plant,Asphalt drum mixing plant |
WAM spiral conveyor asphalt drum mix plant with 18.5KW helical reducer for mixer
Main features of Xitong Asphalt batching plant
1. Containerized deisgned structure of Xitong asphalt plants makes transportation and installation work quick and convenient, saving both time and labour.
2. The circular belt feeder for the batching unit uses a variable-frequency speed regulator to adjust speed freely and control preliminary grading of cold aggregate, 2 hoppers have vibrator for arch breaking.
3. The high-efficiency and heat-preservation drying drum adopts optimal design to make aggregate inside form a special material curtains, which makes heat exchange more sufficient.
4. The hot aggregate bin is equipped with a continuous level indicator which enables the operator to know material level at all times.
5. The mixer adopts horizontal type double helical reducers with mixing blade and arm lifetime more than 100,000 batches.Full open arc type door on mixing tank shortens mixing cycle.
6.The dust-collecting system adopts imported NOMEX material bags which could afford 240 degree centigrade , two-step dust collector controls the density of dust discharged into the air within 20mg/m³, which is completely up to the environmental protection standard.Dust separation efficiency achieves no lower than 85%.
7, Large-power motors are started by soft-starter which is smooth and efficient with smaller starting current.
8, Plc control. mechanical ratio control, multi-control and intelligent control including frequency converting control reduce electricity consumption.
Specification
QLB Series Asphalt Mixing Plant Data Form
Name | Specification | ||||||||
Model | QLB-600 | QLB-1000 | QLB-1500 | QLB-2000 | QLB-2500 | QLB-3000 | QLB-4000 | QLB-5000 | |
Production output | 48t/h | 80t/h | 120t/h | 160t/h | 200t/h | 240t/h | 320t/h | 400t/h | |
Volume of cold feeder | 8m3 | 9m3 | 10m3 | 10m3 | 12 m3 | 12m3 | 16m3 | 16m3 | |
Quantity of cold feeder | 3 | 4 | 4 | 5 | 5 | 5 | 6 | 6 | |
Dust collecting method |
Two stage dust collecting(Gravity type and Air buck flushing type dust collecting) |
||||||||
Fuel | Diesel/mazutl/natural gas/coal powder | Diesel/heavy oil | |||||||
Capacity of hot aggregate silo | 12t | 32t | 40t | 50t | 60t | 80t | 95t | ||
Quantity of hot aggregate silo | 4 | 4 or 5 | 4 or 5 | 5 | 5 | 5 | 6 | ||
Aggregate weighing accuracy | Less than ±0.5% | Less than ±0.5% | Less than 0.5% | ||||||
Filler weighing accuracy | Less than ±0.5% | Less than ±0.5% | |||||||
Bitumen weighing accuracy | Less than ±0.35% | ||||||||
Mixer capacity KG/batch | 600 | 1000 | 1500 | 2000 | 2000 | 2000 | 2000 | 5000 | |
Volume/number of asphalt tank | 10m3/2 | 16m3/2 | 30m3/2 | 50 m3/2 | 50 m3/2 | 50 m3/3 | 50 m3/4 | 50 m3/5 | |
Volumeof finished product bin(T) | - | 60 | 100 | 120 | 160 | 220 | |||
Total power(KW) | 185 | 248 | 345 | 470 | 608 | 680 | 900 | 980 |