Model NO.: | QLB-HX3000 | Production Capacity: | 240t/h |
---|---|---|---|
Overall Weight: | 150T | Filler Bin: | 50 Cubic Meter |
Waste Filler Hoister: | 30tph | Pulse Dust Collector: | Overflow Bin And Filler Bin(60 Cubic Meter) |
Equipment Color: | Light Sky Blue | Software: | Configuration Software |
High Light: | asphalt hot mix plant,bitumen hot mix plant |
45S mixing cycle Hot mix asphalt plant with Relay contactor breaker and softstarter
Environmental testing report for asphalt batch mixing plant
The latest generation of “fully environmental protection type asphalt mixing equipment”, which is of international and domestic leading level, after more than six years of continuous innovation, experiment and improvement by Wuxi Xitong Technology Group Co., Ltd, has been successfully trial-produced! The equipment has been actually used by Zhejiang Zhengfang Transportation Construction Co., Ltd. and Xinjiang Changji Municipal Administration (Group) Co., Ltd., and passed the rigorous testing of National Environmental Analysis and Testing Center and Jinhua City Environmental Monitoring Center Station, each of the environmental protection index meets the requirements, wherein the particulate matter emission concentration measured 5.28mg/m3, asphalt gas emission concentration measured 2.40mg/m3, is a truly clean, smoke-free, tasteless green product.
Maintenance of lubrication for batch type asphalt hot mixing plant
Item | Position | Cycle | Variety | Remark | |
1 | Inclined belt conveyor | Trolley bearing | 3 days | 2# calcium base grease | 1~2- shot |
Transmission chain | 3 days | 20# machineoil | Protecting inunctions | ||
2 | Collecting conveyor | Trolley bearing | 3 days | 2# calcium base grease | 1~2- shot |
Transmission chain | 3 days | 20# machineoil | Protecting inunctions | ||
3 | Dryer | Friction wheel bearing | 3 days | 1# lithium grease | 2~3- shot |
Fade wheel bearing | 7 days | 1# lithium grease | 1~2- shot | ||
4 | Hot elevators | Bearings | 3 days | 1# lithium grease | 1~2- shot |
5 | Filler elevators | Bearings | 3 days | 2# calcium base grease | 1~2- shot |
Transmission chain | 3 days | 20# machineoil | Protecting inunctions | ||
6 | Screen | Principal axis bearings | Everyday | 1# lithium grease | 2~3- shot |
7 | Hot storehouse | Gate shaft bearings | Every month | 2# calcium base grease | 1- shot |
8 | Mixer | Principal axis bearings | 3 days | 1# lithium grease | 2~3- shot |
Gate shaft bearings | Every month | 2# calcium base grease | 1- shot |
Ensuring the following items before any maintenance or repair.
⑴. Shut off the main power supply, and make sure the machine is keeping stop.
⑵. Send out operating alarm, and show the alarm signal at essential position.
⑶. When carrying on adjust to try at any rotary place, there must have the specially assigned person to pay attention to control of the urgent stop button.
⑷. When examining and repairing the inner of facility, be sure to shut off any power supply and close electrical control house, and hang the sign of facility overhaul and prohibiting shutting switch.
⑸. Only qualified and capable electrician could operate electrical system after authorization.
⑹. Before restart the machine, send out alarm ring, and inform all the persons to be careful.
⑺. During operation, equip all the security protection all the time.