logo
products

20G Steel Boiler Plate Asphalt Emulsion Plant , 8mm Flights Highway Construction Equipment

Basic Information
Certification: CE/CNAS/SGS/ISO
Model Number: QLB
Minimum Order Quantity: 1 set
Price: negotiation
Packaging Details: Nude Packing
Delivery Time: negotiation /2 month after received your payment
Supply Ability: 10 sets per month
Detail Information
Model: 4000 Boiler Plate: 20G For Drying Drum
Flights: 8mm Asphalt Pump Capacity: 875L/Min
Dryer Material: 16Mn Fuel: Diesel/heavy Oil/nature Gas
Burner Type: ZZR-4000Y(Q) Filler Tank: 75 Cubic Meter
Waste Filler: 50 Cubic Meter Waster Powder Hoister: 40t/h
Highlight:

aggregate asphalt plant

,

highway construction equipment


Product Description

20G steel boiler plate asphalt mixing station with ≥ 10000H service life rolling ring

 

1. Add aggregate into drum dryer 

⑴. At beginning, start drum, ignite burner, preheat drum with small flame. Long time preheating is not suitable, usually 3 to 5 minutes is good. when the exhausting gas temperature reaches 100℃, add gradually increased aggregate. Increase oil gradually until the equipment works stably according to the temperature of discharged aggregate.

⑵. If the quantity and moisture of aggregate always change, then it is needed to adjust burner accordingly. Although automation has been designed to correct aggregate temperature, which is influenced by moisture and quantity, but the temperature will also experience disaccord at great extent. So, in order to get stable temperature, the aggregate should have stable moisture.

⑶. After the equipment stopped, aggregate is forbade to be left in dryer. After everyday work, empty the dryer through running it. When it is empty already, shutdown the burner and let the drum racing 30 minutes to cool it and reduce the possible deformation or linearity influence to lowest limit.

⑷. High efficiency burner generates heat; temperature is automatically controlled and adjusted according to the temperature value detected by an infrared thermoscope, which installed on chute.

2. Maintenance

⑴. In normal running, the tires locate on the 4 trunnions equably, and their surfaces contact well. If there is clearance between them, add steel pad to shell seat until the clearance eliminated. Do not move the shell seat but only drive it up vertically.

⑵. In normal running, the tire contacts one of the two thrust rollers, and in load running, the ideal condition is that the tire contacts the one near outlet trunk. If this contact cause severe abrasion or excessive bearing temperature for thrust rollers (>700C), adjust the trunnions aptly.

20G Steel Boiler Plate Asphalt Emulsion Plant , 8mm Flights Highway Construction Equipment20G Steel Boiler Plate Asphalt Emulsion Plant , 8mm Flights Highway Construction Equipment

 

Model QLB1000 QLB1500 QLB2000 QLB2500 QLB3000
Production capacity 80t/h 120t/h 160 t/h 200 t/h 240 t/h
Cold Feeder 4x9m3 4x10m3 5 x11m3 5 x12m3 5 x12m3
Drum dryer 1.5mx6m 1.8mx7m 2.2mx8m 2.35mx9m 2.5mx10m
Dust collection method Gravity type first dust collecting and bag pockets filtering
Discharge standard 30mg/nm3 30mg/nm3 30mg/nm3 30mg/nm3 30mg/nm3
Oscillating Screen 4 layers 4 layers 5 layers 5 layers 5 layers
Hot storage  silo 32t 40t 50t 60t 80t
Mixing tank 1000kg 1500kg 2000kg 2500kg 3000kg
Mixing Interval 45s 45s 45s 45s 45s
FillerTank capacity 26+36t 26+36t 30+43t 30+43t 50+35t
Bitumen tank capacity 50000L 50000L 2x50000L 2x50000L 3x50000L
Heat Conduction Oil Stove 300,000 kcol/h 300,000 kcol/h 500,000 kcol/h 500,000 kcol/h 800,000 kcol/h
Finished product silo Volume 60t 100t 120t 120t 200t
Control System Manual /Semi-auto / Automatic
Weighing Accuracy Stone material ≤±0.4%
Filler ≤±0.3%
Bitumen ≤±0.2%
General Installed Power 248 kw 345kw 470kw 608kw 680kw

 

Contact Details