Dryer Durm: | 8380*2200mm | Plant Output: | 180T Under 3% Aggregate Moisture |
---|---|---|---|
Fuel: | Tri-fuel(diesel, Gas, Masut) | Burner: | Tri-fuel |
Dust Filtering: | Bag Type Air Backflow | Induced Draft Fan: | 90kw |
Hot Elevator: | 180tph | Screeninng Dia.: | 3×3mm,6×6mm,11×11mm,19×19mm,30×30mm |
Weighing: | Two Stage Auto Tracking And Compensation | Bitumen Scaling: | 200KG |
High Light: | aggregate asphalt plant,highway construction equipment |
2-stage bag filtering asphalt plant witth 5 cold feeders 180T output under 3% moisture
(1)Raw cold aggregate shouldbe clean, without soil and sundries, whose supply should be nonstop for continuous production.
(2)Average humidity(moisture content) of Cold aggregate <5%
(3)Temperature of the hot asphalt product <160°C
(4)Mixing cycle time 45S, with middle sized bitumen mixture , average density of stone material around 1650kg/m3
(5)Fine aggregate content in mixture <35%;
(6) Filler proportion in raw aggregate should not higher than 3%.
(7)Local altitude should be less than 1000m; Nominal ambient temperature for batching plant runing: around 20°C, standard atmospheric pressure;
(8)Quantity of oversize grain among cold aggregate should be limited within reasonable scope; otherwise it will cause block and reduce the aggregate supply capability.
(9)Water content in filler material should be < 0.5%, without being conglomerated or caked, otherwise will cause material supply break and time delay and affect output accordingly.
(10)The asphalt should be of favourable wrapping property during mixing, therefore aggregate would be completely wrapped by asphalt; asphalt temperature should be controlled in the scope of 150°C±5°C. The using asphalt is normal asphaltthat free from dirt, stain, impurities; or other additives.
Technical Specification | QLB-2000 |
---|---|
Rated capacity | 160t/h |
Cold hopper quantity | 5 |
Cold hopper volume | 10m³ |
Standard burner | Oil,mazut or LPG burner |
Oil Consumption | 6.5kg/t |
Screen | 5layers |
Mixer capacity | 2000kg/batch |
Powder temporary storage capacity | 3m³ |
New filler silo | 30m³ |
Old filler silo | 30m³ |
Finished product capacity | 100T |
Asphalt tank | 3×30 m³ |
Heavy oil tanks | if necessary |
Light oil tanks | 1×30 m³ |
hot oil stove | 500,000KCAL |
The total installedpower | 450kW |
Dimension | 51m×33.5m×18m |