Hot In Place Asphalt Recycling Equipment , Road Paving Machine With ±5% Regenerant Adding Deviation

Basic Information
Certification: CE/CNAS/SGS/ISO
Model Number: ARHR-5120A
Minimum Order Quantity: 1 set
Price: negotiation
Packaging Details: nude packing/bulk ship/ro-ro ship
Delivery Time: 2 month after received down payment/negotiation
Supply Ability: 5 sets per month
Detail Information
Heating Method: Circulation Of Hot Wind Heat Source Temperature: 350℃-550℃
Road Surface Course Temperature: 160℃-180℃ Heating Way: Closed Circuit Hot Wind
Scarifying: 2-3 For Single Layer Remixing Mixture: 140℃
Recycled Asphalt Deviation: ±0.3% Stability: More Than 8KN
Highlight:

asphalt paving machine

,

road recycler machine


Product Description

 

≤1.2mm flatness/roughness hot in place recycling equipment with ±5% regenerant-adding deviation

 

 

Road mainetnance process for old asphalt mixture surface pavement of hot in-place recycling

 

①. Preparation work before pavement treatment

 

②. Original pavement heating(surface layer heating)

 

③. Milling of original pavement (surface layer scarifying)

 

④. Heating the Road trough(second layer heating)

 

Road trough milling/scarifying(second layer milling)

 

⑥. Double-layer heatign unit heats the recycled mixture

 

⑦. Lifting remixer heats and mixes the recycled mixture

Lifting remixer tightly follows the two-layer heater, front heating plate heats the mixture that loose laying on the recycled lane for the last time, collector behind the heating plate collects the heated mixture toward the middle of the lane, the elevator collects the mixture to the mixing tank, which would fall onto paver after mixing, then paving starts,material temperature is around 145℃. Above the top surface of the road trough about 2m in front the paver, infrared heating plate installed below the elevator continuous heats the top and side of the road trough, ensuring the joint temperature above 90℃.

⑧. Paving

The surface temperature of the lower bearing layer before paving is more than 90℃, ensures the intact hot bonded of the both sides’ longitudinal joints and the middle and upper layer. There is barely no difference between mixing temperature in mixing tank and paving temperature, so the paving temperature is around 145℃,

⑨. Rolling

After paving the mixture, manually repair the irregular places, timely clean the sundries out of rolling range on old pavement, following the principle of “follow closely,slow rolling, uniform speed; sides first, middle last”, evenly and fully compacted .

10. Joint treatment

Start point, end point and both sides of the longitudinal direction are all hot seams. If the local evenness of the transverse joint is poor, improve it by oblique vibratory rolling; paving thickness of the longitudinal joint must be strict controlled to avoid elevation difference, to ensure the pavement joints compaction, smooth and straight connect.

11. Test

Inspect the asphalt content and aggregate composition of new mixture by carrying on extraction screening test from on-site random inspection of new asphalt mixture; random inspect the recycled mixture for extraction screening and Marshall test, inspect the asphalt content and aggregate composition of recycled mixture and stability, flow rate and voidage; carry on the detection and tracking of compactness, water penetration, thickness, construction depth toward the finished section of the road.

12. Open the traffic

Open the traffic only after the road surface temp. is less than 50 degrees after completion of the construction.

Hot In Place Asphalt Recycling Equipment , Road Paving Machine With ±5% Regenerant Adding DeviationHot In Place Asphalt Recycling Equipment , Road Paving Machine With ±5% Regenerant Adding Deviation

Hot In Place Asphalt Recycling Equipment , Road Paving Machine With ±5% Regenerant Adding Deviation

 

Temperature control During construction of hot in-place recycling asphalt mixture (unit:℃) Table 1

Construction schedule   
Pavement surface heated by two heating vehicle No more than 195℃
Material bank temperature after first layer scarifying No less than 110℃
Road trough surface temperature heated by channel heating vehicle No more than 195℃
Bank temperature after second layer scarifying No less than 110℃
Road trough temperature after second scarifying No less than 100℃
Recycled mixture mixing temperature No less than 140℃
Road trough temperature before paving No less than 90℃
Recycled mixture paving temperature No less than 140℃
Temperature after the rolling finished No less than 70℃
Open traffic road temperature No more than 50℃