products

120tph Portable Asphalt Plant , Mobile Hot Mix Plant 4 Decks Sieving Layer

Basic Information
Certification: CE/CNAS/SGS/ISO
Model Number: QLB-Y
Minimum Order Quantity: 1 set
Price: negotiation
Packaging Details: Nude Packing
Delivery Time: negotiation /3 month after received your payment
Payment Terms: L/C, T/T
Supply Ability: 10 sets per month
Detail Information
Product Name: Full Mobile Asphalt Mixing Plant Mixing Cycle: 45 Seconds
Rated Production: 120t/h Heating Method: Heat Exchange By Heat Transer Oil
Sieving Layer: 4 Decks Mobile Units: 7
Loading Mode: Chassis With Wheel Colder Feeder Volume: 8 Cubic Meter
Highlight:

portable asphalt plant

,

portable batch plant


Product Description

120tph mobile asphalt plant towed by semitrailer with chassis for moving between sites

 

 

Preparation requirements for installation and trial run of mobile type asphalt mixing plant for customer

I. Following items are necessary for equipment installation

1. The equipment should be placed beside base construction after arrival (do not keep long way distance).

2. Installation site should be base on condition that all of road traffic, electricity and water are available and the road should be solid and flat. Plant base should be finished well according to provided drawing, of which surface must be smooth and level.

3. Facilities and tools needed at site

A 50T Mobile crane/truck crane, a 25T Mobile crane/truck crane (during installation of main building and drier, both of them are needed simultaneously for 1 day).

A Mobile crane/truck crane above 16T

A 2T chain block

A 5T lifting jack

A hemp rope (about 20mm diameter and 30m long)

2 ladders at least 4m.

1 set of welding machine and gas cutting equipment

Other necessary tools in common use: 2 crowbars, 1 mash hammer, 3 hand hammers (2.5 pounds), 2 monkey spanners (12 inch), 1 electric drill, 1 angle grinder and 1 crimping plier.

Enough safety helmets and safety belts, anybody who enters site should be equipped with safety belts.

4. Necessary protection facilities against bad weather (such as a gale, rain or snow).

5. Installation personnel (better for skilled): 1 installation team leader, 1 fitter, 2 welders, 1 electrician and 1 lifting worker.

6. 4-6 ancillary workers, in which there should be 2 high climbers.

II Trial run, training and trial production of plant should be based on following condition:

1, Power line from transformer to mixer should be connected, electricity in normal supply (380V/50Hz/3-phase AC).

2. Make operators and maintenance personnel stand by and enter site in time.

3. Prepare various lubricating oil/grease for equipments according to manual, including high temperature lithium base grease whose dropping point temperature should be no less than 190℃ and penetration is 220/250dmm. 320# heat conduction oil should be about 5T.

4. Preparation of fuel:

Diesel oil in conformity with seasons’ use;

5. Liquefied petroleum gas used for burner ignition.

6. Weights with 500kg in gross (25kg for each).

7. Prepare asphalt, mineral powder and aggregate to be used in production, and enough material loaders and transport vehicles for finished material.

If any faultiness occurs in above 2 items, our site workers would be in charge of supplement and amendment.

120tph Portable Asphalt Plant ,  Mobile Hot Mix Plant 4 Decks Sieving Layer

 

Model QLB-Y1500
Capacity 120t/h (standard working condition)
Mixer Capacity 1500kg/batch
Diesle Consumption 5.5-7kg/t;
weighing Accuracy Aggregate ±0.1%
Bitumen
 
±0.16%
Filler
 
±0.2%
Finished Asphalt Temperature 130℃-165℃
Air Emissions ≤20mg/Nm³
Dark exhaust standard Ringelmann I
Working room noise ≤70db(A)
Operation Full Auto//semi Auto/Manual Operation
Total Installation Power ≈298kW
Voltage 220V/380V-50Hz (adjustable)
Total weight 136T
Total Packing volume 1200M3
Mobile units number 7(finished mixture bin mobile unit is optional)

 120tph Portable Asphalt Plant ,  Mobile Hot Mix Plant 4 Decks Sieving Layer

Contact Details